You've won the bid. Now comes the part that separates contractors who make money from those who bleed it away: the prep work before day one. If you skip this, you will face surprises that cost you. A simple walkthrough and a few written documents take a few hours but can save you thousands in disputes and delays.

WALK THE JOB WITH THE CUSTOMER

Before you start ordering or committing to a date, walk through the job together. Bring a notepad or take photos on your phone. Look at access, utilities, existing conditions, and anything that might affect your work or the customer's life during the job.

For example, if you are doing plumbing work, ask: Where is the water shut-off? Is the basement dry or flooded? Are there finished walls you need to protect? If you are doing roofing, ask: What is the access like? Where can you stage materials? Are there power lines nearby?

This walkthrough catches details that the estimate did not and shows the customer you are thorough. It also gives you a chance to spot obstacles before they become excuses for delays.

GET THE SCOPE IN WRITING

After the walkthrough, write down exactly what you will do and what you will not do. This does not have to be fancy. It can be an email, a one-page document, or part of your contract. The point is that both you and the customer have the same understanding.

For example: "We will replace the water heater with a new 50-gallon unit. We will disconnect the old unit, install the new one, and test it. We will not move pipes or add additional connections. We will not remove debris from the site."

Be specific about what is included in your price and what costs extra. If you think the job might uncover something unexpected, say so up front. For example: "Once we open the wall, we may find old wiring that needs to be replaced. If that happens, I will call you for approval before proceeding."

Send this scope to the customer in writing and ask them to confirm it. If they ask for changes, update it and resend. Do not start work until they sign off.

CHECK AND HANDLE PERMITS EARLY

Ask yourself: Does this job need a permit? If you are not sure, call your local building department or the Texas city or county where the work is happening. Do not guess. A job without a permit can turn into a big problem for you and the customer.

If a permit is required, start the process now. Do not wait until you are ready to start work. Permits take time. Approval times vary by city and by the type of job, so ask how long it usually takes. Find out what the city needs, submit the paperwork, and plan your start date around the permit approval.

Keep a copy of the permit posted on site as required. If an inspector is needed, schedule that in advance so you do not show up and find out the job cannot pass inspection.

ORDER MATERIALS NOW

Once you have the scope locked in and permits handled, order your materials. Do not wait until day one. Materials can take time to arrive, especially if you need something specific or if there are supply delays. If materials are not there when you show up, you waste a day or more.

For example, if you are building cabinets, order the lumber, hardware, and finish. If you are replacing an HVAC unit, make sure the unit and ductwork are on hand. Order extras of small items like fasteners, tape, and sealant. It is cheaper to have them on hand than to run out mid-job.

Create a simple checklist of what you need and confirm it is all ordered before you lock in the start date.

GIVE A CLEAR, FIRM START DATE

Once the scope is written, permits are in process or approved, and materials are ordered, tell the customer exactly when you will start. Say the day and time. For example: "I will be there on Monday at 7:00 AM" is better than "sometime next week."

Confirm this date with the customer in writing, in a text, or in an email. Give them your cell number so they can reach you if something changes. Tell them what to expect on day one, how long you think the job will take, and what you need from them (access, parking, a place to store materials, and so on).

If something changes and you cannot make the date, call the customer immediately. Do not text. A phone call shows respect and prevents miscommunication.

THE PAYOFF

This prep work takes time, but it pays for itself in the first few hours of the job. You avoid surprises, keep the customer happy, and move through the work faster because you know what you are doing. You also have written proof of what you agreed to if a dispute comes up later.

Check before you act

  • Confirm with your local building department whether your type of work needs a permit for the area where you are working.
  • Verify your contract or scope document covers what you will and will not do, including cleanup and protection of the customer's property.
  • Ask your supplier how long materials typically take to arrive for the specific items you need.
  • Check your schedule and the customer's availability to set a start date that works and that you can keep.

By The Contractor Network. This is general guidance, not legal or financial advice.